I worked on three customer quilts yesterday. First, Sharon's quilt had to be set up on DW for E2E work with the Pro Stitcher.
 |
| Babysitting the computer |
Here's the motif going into Sharon's I Spy quilt...
 |
| Flutterbys |
Once I got everything all set for Jim to sit and babysit, I moved over to Judy's quilt on Marty. I didn't think I would be spending all day on her quilt since I only had borders, sashing and ditching to do. But, quilting life throws curve balls and that's exactly what happened. All. Day. Long I was working on that quilt!
My goal was to get Ila's quilt moved over to Marty before shutting down for the day, so working 'overtime' was in the cards last night.
At around 6:00 her quilt was moved, loaded, basted in, and threads are selected ready for me to start right in this morning.
 |
| Next up on Marty |
And why I'm working on Marty, I'll be frame ironing the back for Sharon's next Princess quilt on DW and whatever is up next on Bernie. The one on DW has been started, but then this happened with the last roll last night...
 |
| Can you see it? |
The center of this backing is dipping down while the insides are fine. The back is as tight as possible on all four sides. Jim is still learning and he's the one that loaded this back with the selvedges on the side rather than the top and bottom. I'm going to have to remove it and turn it 90 degrees. From there it will have to be back and front rolled to try to get this to even itself out.
An inexperienced long armer would have no idea how to remedy this, and I've only ever seen it one other time, but I know, from watching and learning from other long armers how to deal with this situation.
Meanwhile, Jim is running into town this morning for more tax stuff and other miscellaneous errands so will work on his E2E quilt later this afternoon AFTER I get the backing situation taken care of. Maybe.