Monday, September 22, 2025

A New Week

Well, the quilts that were washed/repaired have made it to Germany. A huge thank-you to Tim and Julie for hand delivering these for us! They were able to spend six or so hours with the kids and it looks like our newest granddaughter is growing well...

They look so happy!
While we were talking to the kids, Caleb wanted to see the new screen door and I needed to get an updated picture of the house anyway so here's the back as you pull into the drive (on a lake, the front of the house is actually the lakeside of the house)...

I love my new screen door!
On to quilting studio things. Yesterday I was able to get the second block set inside the log cabin...
Number Two
After that was finished I moved over to DW and selected a motif, while probably not the best one to select, was one that I love to quilt out and suits me perfectly (I have a terrible sweet tooth)...
Candy, candy, candy!
Hershey kisses, lollipops, candy canes, gum drops, popsicles, ribbon candy...you name it, it's probably in there. 

This panel is for the stand mixer cover I want to make for our rarely used stand mixer in the kitchen. I'm tired of dusting it and with the cover, I can just take it out and give it a shake every few weeks. 

Todays work includes getting the Tilda Sampler off Marty and getting a new backing started. The quilt on Bernie may or may not be started because I'm kind of hoping to get through my new class (Quilters Groove Academy) before I start, BUT, I'm weeks away from being able to design and fill the negative spaces, so maybe not?

I have another October deadline that will be heading onto Marty once I get the back frame ironed. Actually, I have a lot of odds and ends to tidy up out there before actually starting on any of the machines, so I better get out there and get to it. 

No comments:

Post a Comment

Gotta Be A Little Flexible

I was working on the quilt on Bernie yesterday morning. I took my lunch and while chowing down [another] rice bowl, received a text from Ann...