Despite all the Christmas deadlines, the Temperature quilt still needs to be kept up. I didn't do anything with it the previous week and unfortunately, this is as far as I got yesterday.
 |
| Only three cut out |
Jim decided we needed to go to Northwoods in Pinconning to pick up dog shampoo and anything else we stumbled across. We were there for quite some time (way past lunch), and instead of our planned meal, stopped and got a pizza instead.
Since it was well into the late afternoon going out to the studio wasn't an option. However, I did do some quilting stuff.
 |
| Making a garland |
Because of the retirement situation and having to kind of watch our pennies, we decided to make our own garland for the stairs and the loft rail. I tied about 12 feet yesterday (of the 40 that we need). I need to cut more fabrics because it's starting to repeat itself too much.
No comments:
Post a Comment