Here's what hit the frame yesterday...
![]() |
| Monsters, (Inc?) |
![]() |
| String Top |
![]() |
| Quilting detail |
Here's what hit the frame yesterday...
![]() |
| Monsters, (Inc?) |
![]() |
| String Top |
![]() |
| Quilting detail |
This is Becky's top. She said it was a utility quilt. Utility quilts generally get an edge-to-edge done on them. This top said "No." This is what's on the frame now.
![]() |
| Becky's braided top |
This top is getting so pretty!
![]() |
| See what I mean? |
Hazel has been shaking her head repeatedly which I could even overhear yesterday with my headphones on. She has some kind of infection or something going on in her off ear so she's going to the vet tomorrow.
After changing my mind on the string quilt block settings, quadrant one went together last night. Quadrant two is already started.
Will continue with Becky's top today (since custom work takes way longer than E2E), have a meeting with a returning customer first thing this morning and a nail appointment in the afternoon. A fun day ahead and it sure beats having to punch a time clock!
Since our flood 9 months (has it only been that long?) our water quality has begun to deteriorate. Rapidly. Our softener and R/O system can't seem to keep up with the ever changing extremely low water table. And then we had a power outage two weeks ago and that seems to have really sent the softener into a tailspin.
This is my sterling silver ring after noticing last week the rotten egg smell and the high salinity when rinsing out my mouth after brushing my teeth.
![]() |
| Water issue |
I did do a little sewing though while Jim was called on out Saturday. Another 10 string blocks and a new layout. And since this layout pretty much calls for an 8 x 8 setting, I'm deducing the blocks number to 64 rather than the 100 originally planned. It's going to be a nice size quilt top even with the reduction since the blocks are finishing at 10 1/2".
![]() |
| New string layout |
Loading a new customer quilt today. I don't know which one but there will be a pic tomorrow of who was next in line to get completed.
Jim had to run to a call-out and after our quilt deliveries/food pick up jaunt this morning I'm able to get into the studio for a spell.
![]() |
| It's a top! |
The Rail Fence top is done. It finished at 86" x 94" and I wanted to load it so badly last night. But, no backing. It's probably just as well since I still have a few customer long arm things to work on still hanging out in the "holding cell".
After the rail fence top was finished, I pulled out #2 of my year-to-elminiate-scraps project. Strings!
![]() |
| Reminds me of the framing wall at Hobby Lobby |
I did exactly ten string blocks over the entire weekend. This is what we were doing instead.
![]() |
| Before |
![]() |
| After |
Friday was a shopping day with mom. Here's my Aunt Effies haul.
![]() |
| For a little over $100 |
I did come home after our shopping day and start these...
![]() |
| The start of 100 11" string blocks |
Yesterday turned out to be a half day of work for me. Jim got home around lunch time towing this behind the truck. Once we got through lunch...