Showing posts with label Forte. Show all posts
Showing posts with label Forte. Show all posts

Thursday, April 3, 2025

Today is the Day!

Say good-bye to Foster...

Getting ready to leave
I really, really, really tried to like this machine. And he was great the first week he was here and the first week he came back after getting serviced. But then he started slamming, crunching, and started having electrical issues. I didn't feel like we were gelling all that well.

Marty is on his way to replace Foster as "we speak" and I'm so excited. 

Yesterday was spent on Ronda's quilt. After shutting down around 5:00 I had to move some more stuff in the studio to make way for today's arrival. I also had to prep backing and fabric swatches for class tomorrow. Once that was done, three more Pineapple blocks were made. 

In amongst the machines leaving (DW is going down with Foster for service) and the machine arriving, I'll be finishing Rondas quilt as I only have the two sets of borders and the side sashing to finish. I could have done that last night, but I didn't want to dive into a whole new quilt while the guys were here asking questions and making disrupting noises.

I've gotten to where I'm getting pretty regimented and while I'm happy about Marty's arrival, it does disrupt my day and I need to focus when I'm starting a new quilt top so I thought it prudent to keep to what I know for the work I'm doing while they are here. 

Yesterdays weather started out with about an inch or more of snow. That changed to freezing snow/rain. Near lunch that changed over to thunderstorms, then it rained and was very windy the rest of the day. Ahhh...spring in Michigan. Another windy day today, but the sun is peeking in and out of the clouds. No precipitation is expected so the guys will be dry while running in and out of the studio. Can't wait to show pics of the studio all put back together tomorrow!

Friday, May 31, 2024

Faster Than A Speeding Bullet

Okay, so the Linda quilts are not going to take as long as I thought they were going to take. The first one (Williams) is done and the second back is being frame ironed right now. I'll get that loaded in the next half hour.

Dealing with wavering borders. Again!

No work on Rae's quilt yesterday. 

Work on Foster did occur and a couple of lessons were revisited while working on it. 

    Lesson 1) Don't assume the parts that come with a new machine are ready to quilt with, i.e. the needle. Skipped stitches taught me that. So replaced needle. And did a thorough cleaning of the race and bobbin area. 

    Lesson 2) Don't assume new is better. While I appreciated the idea of clear view on the frame, it was not holding the quilt parallel with the ground, and, I didn't have anything to put my arm/hand on while quilting. Thank goodness it wasn't an extra feature I had to pay for; it just came with the frame. 

    Lesson 3) Different thread delivery requires modifications on thread treatment. I will have to net all the large cones of thread on the new machine because the thread base sits and is designed differently. It kept catching and breaking/shredding the thread. 

Here's what was giving me these re-learned lessons...

Crazy Feather

Work on Jay consisted of two blocks, but the first row is ready to assemble. Jim yard mowed this week so I didn't have to which gave me an extra two hours of studio time. Yay!

Gas line in!
Jim also did some studio work outside. The gas line is buried and no longer worrisome to me. It made me nervous with it above ground, especially since we are into mowing season. A very productive day for us both!

Thursday, May 30, 2024

Tattoos

The new long arm didn't seem like part of the "gang" until he was reasonably dressed. Meaning, he needed some tattoos to fit in with the crowd. Nearly all of my machines have some kind of bling on them and it was a visual priority for me to get him to fit in...

Do you see anything missing?
Jim noticed it right off the bat when Foster was delivered. Can you see it? The line on the "Q" is missing, making it look like I have a HoForte. No, he's a guy, not a ho. 😆

DW stitched Ann's quilt out beautifully but I can't say the same for me. The motif I selected was too big for the frame space and he, inadvertently, twice, motored out because I didn't give him enough space. That was fixed (error on my part) and he had her quilt done by lunchtime.

In fact, I was starting to frame iron the back of the next set of quilts when I called Ann to let her know it was finished. Yes, I wrote that correctly; the next SET of quilts. 

Here's what I'll be working on today...

Linda's first of three for William
There's a story that goes with the next three quilts but I won't carry one about that. They are all pretty much the same but each requiring a little different treatment in quilting. This is Williams' quilt. 

I'll be using the ProStitcher to do these, but not in the E2E format. Each individual block receives a singular motif. All the blocks have to be ditched, so I'll be driving that portion, but then will engage the motors to do the piano keys and the motif for each block. Very time consuming!

Each of these next three quilts measure 80"x100" so this isn't a one day and done situation. Plan on seeing these for a while. 

Nobody expected today. My batting and the tattoos showed yesterday. Still waiting on the Red Snappers and a check from a customer but doubt if they'll show today as I received texts/messages about both just yesterday. Onward, ho. 😊

Tuesday, May 21, 2024

Welcome Foster!

We have the final piece put in place in the new studio. Well, equipment-wise anyway. There's still work that needs to happen structurally but as far as my end goes, I'm all set. 

Here's the new (and final) addition...

His name is Foster
I had never seen this particular machine before (though worked on another Forte in Utah). I didn't test drive it. I bought it sight unseen but was confident in my dealer and moreover, the Handi Quilter name. I loaded him up as soon as Jim and I got him all together and other than getting adjusted to button locations on the handlebars, it'll be a smooth transition from machine to machine. 

Moves like glass on his rails
This was my very first attempt at using him. Not bad? I wanted to play more, but we had a nasty thunderstorm heading our way and frankly, with all the excitement of him coming, I was pooped out. And I feel like I'm coming down with something. AGAIN! Of course, we visit the grandkids and I come home with something yucky.

Foster was supposed to come with a ruler base, but that did not happen so I need to contact my dealer about it. And it looks like, since this machine was a floor demo, he was pretty much stripped of some of his external frame parts; side clamps and batting bar. His "welcome" box had only some brief instructions and four bobbins. Far less than what he was supposed to come with. But most of that stuff I already have around here. 

There are two things I need to order for him that were not included in his purchase: a) Red Snappers. I will NOT pin to my leaders (too clumsy), and b) Anti-Fatigue mats. I don't absolutely need those right now, but will need them in the near future. 

Jim and I did not work on the gable siding last night because we were putting Foster together and then he got called out on a "smells gas" call. And, again, storms coming in.

Here's what I'll start with today on DW...

Cheryl's second quilt
This is going to get a free hand free motion hook swirl. DW drove all of yesterday on those individual blocks in her first quilt so I'll give the computer a break. Plus, I'm faster. 

No customers or deliveries expected today except maybe a roll of Hobbs Batting; not a customer, just a delivery.😆

On a Whim

The morning started out with the Temperature blocks and then I had to make a prototype of a notebook cover to see if I liked the pattern I...