Friday, November 13, 2026

Mentally Preparing

While I'm working today, I need to take what I have mentally catalogued into random things for retreat and start making a physical list. There are more than three items I've thought of meaning my brain isn't going to remember everything if I don't make a list. 

Diane's sixth quilt is done but still on the frame; and I'm not taking it off. Chances are she'll be up next week and need to explain to why little quilting was put into the tall ships. I don't want to mess up her trapunto.

I moved over to this quilt by late morning. 

A guitar variety
The customer, Cheryl, said to just have fun with a few exceptions. She did want swirls in with all the other "goodies" in the negative space. Here's a first pic.

The treble clef
While I was talking to Andrew on his way home I constructed and quilted this into the negative space. 

The first four notes of Amazing Grace
I also have random bass clefs scattered throughout to start the fun.

After hanging up with Andrew it was well past four. I shifted over to doing more stars for the Old Glory top I'm constructing. These five are now done. Each of the next five are individually different.

Jim had just gotten home from his Saginaw dentist appointment (only to find out they couldn't do anything there with his needed root canal) and after exchanging 'day' notes, I moved onto DW. Four more blocks on Hannah's quilt were completed. Sorry for not posting pics, but I'm basically just outlining all the letters/flower/leaves. Nothing earth shattering or very pretty to look at. 

Meanwhile, Google is currently down. I need Google to take a closer look at the make-up of a guitar so I can start getting strings in the first one shown above the staff. I can always work the background and can deal with the actual guitars themselves when Google finally decides to come back up. 

Thursday, November 12, 2026

Great Skating Session

I was very negligent in my balancing exercises last week and figured I was going to pay for it at skating yesterday. But much to my relief, I didn't fall (two other skaters did) and I'm still unharmed. I call that a win.

After returning home from skating/lunch/groceries I started going through my bucket bin to see what I wanted to work on next. Other than Hannah's quilt on the long arm I have nothing here going. I have a few headed to Shipshewana but they're packed and I'm not going to mess with all of that.

I pulled out one of the projects, read through the directions, and just wasn't feeling it yet. Then another one caught my eye and since it was Veterans Day yesterday I was feeling a little nostalgic. Here's what I'm going to be working on.

I have a layer cake and a jelly roll strip to work this with but still ended up pulling from my stash for a little color variation. Here are the first two blocks (of ten).

After piecing for a little bit I moved over to DW and worked six more blocks on Hannah's quilt.

A regular work day will start me out on Diane's quilt on Bernie. I don't remember where I left off Tuesday. I may be able to start the quilt loaded onto Marty which I haven't gotten a pic of yet. 

Wednesday, November 11, 2026

All Three Long Arms

This is what I was working on yesterday after Sandy's Tilda Sampler was done. It's Diane's 6th quilt.

Come Sail Away

After working on the two Bernina's I had to reset my arm before jumping on DW. Even though we've taken off his computer hardware and have lightened him up, I still reset for a little bit.

I decided to try something new around the house. I made this.

Did we actually forget this holiday?
That didn't take too awful long and I wanted to actually sew something. I did a test block for the upcoming retreat and the Granny Squares blocks is one of the projects I'll be working on. 

Granny Square block by Lori Holt
I'm glad I always make myself do a test block. While the block itself turned out pretty perfect, I trimmed it a little not so perfect. I'll put it on the bottom somewhere or make a pillow out of it. 

Andrew called just as I was firing up DW. I was able to get three blocks worked on DW for Hannah's quilt while talking to him. Since there is so much writing and color changes, this one is going to take some time to get done. 

Off to do some skating and grocery getting. 

Tuesday, November 10, 2026

Happy 82nd Mom

Moms birthday was yesterday. She's now 82. This morning she's at Urgent Care complaining of stomach pain. She has diverticulitis and yesterday ate things like beef, sausage, and other foods not compliant with her diverticulitis diet. I wonder why she has stomach pains? 😖

I knocked off early so we could head into town and deliver her a floral bouquet and a card. We also stayed and visited for a while so didn't get back home until well after 6:30.

I called the cousin yesterday morning to let her know my travel plans next week. When she called back we were at moms and didn't having billing info for her yet; had to deal with that right away upon our return.

From there I cut batting and got Hannah's quilt ready to start on later tonight. 

Sandy's quilt did not get done because of the florist hours (they closed at 4:00) and other quick tasks Jim needed to take care of prior to normal studio hours. I'm starting early today to make up for it, but Sandy's Tilda Sampler will be done today. 

Monday, November 9, 2026

After working around the house Saturday morning and making fish tacos for lunch (Jim was late getting home from Food Bank), I headed finally headed into the studio. 

The first order of business was to get the cousin quilt finished. 

I need to call her and let her know I'll be coming through Charlotte a week from today for her to have.

Next, get Hannah's backing onto DW and start frame ironing. Okay. That's started.

What to do next? I can't really start anything big (my rules) until all the Christmas gifts are finished. But, I do need a Christmas bow to put on the studio door in a few weeks. We always decorate on Thanksgiving night. 

That may change this year. The grandkids usually help to decorate and they aren't coming up until the Saturday after Thanksgiving. The house will be lit though. I hope. 

Here is my start on the Christmas bow...

And of course, yesterday was a non-studio day. We ran to Wal-Mart and Home Depot up in West Branch looking for pillow inserts for Hannah and Penelopes pillows as well as window film. We struck out on both accounts. 

Today I hope to finish Sandy's Tilda Sampler on Marty. I have a 12/1 deadline in the queue I should probably tackle next and get started on that before heading down south. So. Much. Pressure! It's not the only December deadline I have and UGH, it keeps me awake at night. 

Saturday, November 7, 2026

After Visiting

We had a delightful visit with mom and Chad yesterday. Tried the new Char House restaurant in Gladwin. Great food but freezing in the place; it was 44 degrees outside and yet the radiators in the old structure were stone cold. 


Once we were done with lunch we headed home via Pieces of Thyme. The original backing I got for the cousin quilt was too small by only a couple of inches so found a perfect back in flannel instead. Got that loaded on DW and am just doing an E2E on it.


After one pass and happy DW's stitch regulator is working after having taken all the computer components off, I was back in on Christmas gifts. The girls' pillows are sewn and all I need are the inserts. 

I also got caught up on the Temperature quilt blocks but had to go back and rip a few seams because I forgot the monthly placeholder between October and November. With that fixed I cut more green strips for our garland and then started gridding out fusible for another big [holiday] bow. I could have bought the premarked stuff but am watching the pennies before Shipshe. 

Once that was done I started pulling fabrics to begin cutting today. I'll be working on the bow at retreat and need to cut all the 2 1/2" blocks before I leave. Cutting here is much easier than trying to talk and cut there. 

I was on the phone with the Germany kids this morning for over an hour so I"m blogging late since after the phone conversation (and shower) decided the bathrooms all needed a good scrubbing. Now I can play the rest of the day. 

Friday, November 6, 2026

Visiting with Family Today

My brother is up from Cincinnati. I only get to see him about twice a year meaning we're taking today off to go visit him at moms house. 

I have made exceptional progress on Sandy's quilt and worked well after quitting time. From there I blanket stitched the two grand-girls' pillow tops and then made the backing for each of them.

Blanket stitch detail
I made zippered backs for each of the boys' pillows. Boys naturally don't take care of their stuff so I'm assuming the pillows will be all over the house without regard to dirt. The girls' pillows are getting an envelope back so they can still take off the cover to launder. I nearly broke a needle doing the zippers for the boys and the new zips I purchased (on line) are more for heavier projects like jackets. Not pillows.
Just watching the game
Jim's new Spartan fleece throw is getting good use and Lucy finds it very snuggly as you can see. She was watching the game with dad and I couldn't resist getting a quick pic of her in all her cuteness. 

Black Friday Day

We don't participate in all of the black Friday stuff. But, we do need to get out today to get groceries (haven't done that since be...