The little kids are getting ready for their big move to Germany. They have to be out of the apartment on 4/1 but everything has already been shipped out so it's basically a cleaning game. And getting rid of things they aren't going to transport with them; cleaning supplies, boxes, etc. We are meeting them downstate tonight to get some of that stuff.
It's going to be hard not talking to him every few days. I'm getting sad thinking about it, so let's change the subject.
Here's what DW is wearing...
![]() |
Karen's Christmas Quilt |
![]() |
Letting it relax |
Meanwhile, this was loaded onto Bernie...
![]() |
Ronda's applique top |
It's funny how one can amuse themselves when between projects. I finished Linda's binding right after lunch and then had to wait for the back of both of the quilts above to be ready to load. With that time I:
1. Cleaned both machines and their carriages.
2. Selected threads for the bobbin and top.
3. Updated the computer queue to match the written one
4. Cut up the blocks on the design wall for the Pineapple top
5. Started getting stuff off Foster for his trip next Thursday
6. Snagged a pic of Rondas quilt to make sense of how it was going to get quilted
7. Reset the design wall since it was now empty from the previous project
After working until about 6:00 last night, I played with some more Pineapple blocks. I have a customer coming today to pick up and will be 'closing' early to leave to meet the kids later.
No comments:
Post a Comment