Yesterday wasn't spent in the current studio, but rather assisting (when needed) on the new studio. None of the machines were turned on. It was a low-keyed but productive day. Jim got the black pipe run through the crawl space.
Temporary until we get the walls up |
Next up was the insulation around the sill plates on the interior of the crawl space.
It should be warmer then the current studio |
Ready to disperse where needed |
It's supposed to be blazing hot today so we are probably not going to do much out there. And, we have three grandchildren showing up later this afternoon for us to watch all this next week.
We've already rearranged the living room to cover the dangerous hearth up and I've moved all the quilts waiting to be picked up into the studio so kids can't get near them. The studio doors will be closed so little hands can't touch the two quilts I'm working on.
The girls knew something was going on this morning (they hate it when we rearrange things in the house). They were laying there waiting for me to reassure them this morning while I was making beds and getting my shower.
Please let us know everything is okay mommy |
No comments:
Post a Comment